Stromek - 01

Check out our various Equipment and services we work with and we deal with.

About OUR SERVICES

Our work is our reputation, and we protect it with every project we do

Looking for a reliable piling contracting company to handle your next construction project? Look no further than us! We pride ourselves on being the best in the business, providing top-notch services to our clients across a wide range of industries. Whether you need foundation piles for a commercial building, seawall piles for waterfront properties, or anything in between, we’ve got you covered.

Areas of Expertise

1. Foundation Pile

Bored Piles

Bored piles (Replacement piles) are generally considered to be non- displacement pile where a void is formed by boring or excavation before piles is produced. Piles can be produced by casting concrete in the void. Some soils are particularly amenable to the formation of piles in this way, since the bore hole walls do not requires temporary support except cloth to the ground surface. In unstable ground, such as loose sand the soil requires Temporary support by means of casing or Suspension fluid such as Bentonite. Alternatively the casing may be permanent, but driven into a hole which is bored as casing is advanced. Generally STROMEK execute bored piles ranging in diameter from 60cm to 250cm extending to maximum depth of 50.0m . Being non displacement type piles, bored piles can be installed with little or no vibration, and with much lower noise levels.

CFA Piles

CFA (Continues Flight Auger) is one of the cast in situ replacement piles using the soil as a temporary supporting for the drilled hole by drilling a hollow. Stem auger into
the ground to from the pile diameter. Ready mix concrete is pumped into the hole as the auger is removed, eliminating the need for temporary casing or slurry. After the
auger is removed, reinforcement cage is installed. Generally STROMEK execute C F A piles ranging in diameter from 50cm to 75 cm extending to depth up to 16.00m.
C F A can be installed quickly and inexpensively.

2. Earth Retaining

Sheet Pile Wall

Sheet pile wall is commonly used as a temporary retaining wall system. The suitability of sheet pile to be used is generally influenced by the following factors

  • Soil condition and the case of pile installation.
  • Depth of excavation.
  • Water tightness.
  • Ability to withdraw temporary sheet pile after used.
Soldier Pile Walls (Soldier Piles & Horizontal Lagging)
  • Soldier pile wall has two major components; soldier pile (vertical component) and lagging (horizontal component).
  • Soldier pile installation resistance is quite similar to the sheet pile.
  • Soldier pile is normally used for small shallow excavation in soils above ground water table as a temporary support.
Contiguous Pile Wall
  • Contiguous pile wall can be both temporary or permanent wall for excavation. Usually, contiguous pile wall is used where low water can be achieved.
  • The advantage of contiguous pile wall are lower cost and speed in construction for temporary or permanent wall where drilling conditions are conductive. The system has higher capacity to overcome obstruction like work compared to other systems. However additional works are needed to from an acceptable surface to the wall.
Secant Piles Wall
  • The major disadvantage of contiguous piles walls is the lack of water tightness has been effectively overcome by interlocking as in secant piles wall. Other than water tightness secant piles wall has similar advantages and disadvantages as contiguous piles wall.
  • This method consists of boring and concreting primary piles at center to center spacing of slightly less than twice the normal pile diameter, secondary piles are then bored at mid –distance between primary piles before. Concrete has achieved its full strength. Reinforcement is usually concentrated in secondary piles.
  • The main advantage of the secant pile is the possible full temporary protection in sensitive and ollapsible soils and ease of coring into rock.

About OUR SERVICES

Our work is our reputation, and we protect it with every project we do

Looking for a reliable piling contracting company to handle your next construction project? Look no further than us! We pride ourselves on being the best in the business, providing top-notch services to our clients across a wide range of industries. Whether you need foundation piles for a commercial building, seawall piles for waterfront properties, or anything in between, we’ve got you covered.

EQUIPMENT WE USE

Explore Our Services and the Equipment we use for our projects.

When it comes to constructing a building or any structure, the foundation is one of the most important aspects that needs to be taken care of. A strong foundation ensures that your building can withstand any natural calamity and remains stable for years. At our company, we understand this importance and use only latest products for our piling and foundation projects.

We believe in delivering the best quality services to our clients and make sure that we use latest technology and products in all our projects. Our team is well-versed with the latest trends in construction industry and strives to incorporate them into their work. With an eye on innovation, we constantly keep updating ourselves with new techniques to make your building as strong and durable as possible.

Drilling Rigs

S.No Equipment Name Model Quantity Max Depth (M) Max Diameter (mm) Max Torque (KNm)
1 IMT AF 15CFA Hydralic Rig AF 15 1 140
2 Soilmec 412 HD Hydralic Rig R 412 HD 1 40 1200 109
3 Soilmec 415 Hydralic Rig R 415 1 40 1500 150
4 Soilmec R 10 Hydralic Rig R 10 1 30 1200 109
5 Soilmec 622 Hydralic Rig R 622 1 48 1800 201
6 Soilmec 416 Hydralic Rig R 416 1 42 1500 161
7 IMT AF 10 Hydralic Rig AF 10 1 38 1200 98
8 Soilmec R 825 Hydralic Rig R 825 1 52 2000/2500 292
9 Soilmec SR 40 Hydralic Rig SR 40 2 42 1500 161
10 Soilmec SR 50 Hydralic Rig SR 50 1 48 1500/2000 180
11 Soilmec SR 60 Hydralic Rig SR 60 4 48 1800 201
12 Soilmec SR 90 Hydralic Rig SR 90 2 75 1800 201

Anchor Drilling Rigs

S.No Equipment Name Model Quantity Max Torque (KNm)
13 Soilmec SM 305 Hydralic Rig SM 305 1 49
14 Soilmec SM 400 Hydralic Rig SM 400 1 55

Mast Mounted Hydraulic Vibrator Rigs

S.No Equipment Name Model Quantity Max Depth (M) Max Torque (KNm)
15 ABI ZR 28T Hydralic Rig-White ZR 28 T 1 14.3 600
16 ABI ZR 28T Hydralic Rig-Yellow ZR 28 T 2 14.3 600

Service Cranes

Sl.NoEquipment NameModelQuantityMax Capacity (t)Max Boom Length (m)
1NCK CRAWLER CRANE305812014
2RB CRAWLER CRANERB 3016036
3Hitachi KH 70 ( 22.5 Т)КН 70122.517
4Linkbelt FMC (Red)LS 7812716
5Hitachi KH 125KH 125-113521
6Hitachi KH 125KH 12513528
7Hitachi KH 180KH 18015029
8Link Belt SuMitiMoLS 10814528
9QUYSOC Crawler CraneQuy 50 С15036
10Hitachi KH 180/3KH 180/325028
11QUY80C Crawler CraneQuy 80 С18031
Image 1 Image 2 Image 3 Image 4 Image 5 Image 6 Image 7 Image 8 Image 9

Powerful straight forward solutions for your construction needs

STROMEK is a leading provider of piling and foundation solutions for construction projects. We offer powerful and straightforward solutions that ensure your project gets off on the right foot.